When loads get too big for forklifts and too precise for rough handling, teams turn to overhead cranes. This field-tested breakdown shows how a full overhead crane system comes to life inside a structural building. You’ll see hoist and trolley setup—all explained in clear, real-world language.
Overhead Crane, Defined
At heart, a bridge crane is a bridge beam that spans between two runway beams, with a trolley that travels left-right along the bridge and a hoist that lifts the load. The result is smooth X-Y-Z motion: long-travel along the runway.
They’re the backbone of heavy shops and assembly lines, from beam handling to turbine assembly.
Why they matter:
Safe handling of very heavy, unwieldy loads.
Huge efficiency gains.
Lower risk during rigging, lifting, and transport inside facilities.
High throughput with fewer ground obstructions.
Scope at a Glance
Runways & rails: continuous beams and rail caps.
End trucks: motorized gearboxes for long-travel.
Bridge girder(s): single- or double-girder configuration.
Trolley & hoist: reeving, hook block, upper limit switches.
Electrics & controls: VFDs, radio remote, pendant.
Stops, bumpers & safety: end stops, buffers, travel limits.
Depending on capacity and span, the crane might be a single-girder 10-ton unit or a massive double-girder 100-ton system. The installation flow stays similar, but the scale, lift plans, and checks grow with the tonnage.
Pre-Install Prep
A clean install is mostly planning. Key steps:
Drawings & submittals: Freeze the GA and verify reactions with the structural team.
Permits/JSAs: Job Safety Analysis (JSA) for each lift step.
Runway verification: Check baseplates, grout pads, and anchor torque.
Power readiness: Confirm conductor bars or festoon supports, cable trays, and isolation points.
Staging & laydown: Mark crane components with ID tags.
People & roles: Appoint a lift director, rigger, signaler, and electrical lead.
Tiny survey errors balloon into hours of rework. Spend time here.
Rails & Runways
If rails are off, nothing else will run true. Targets and checks:
Straightness & elevation: Laser or total station to set rail height.
Gauge (span) & squareness: Use feeler gauges on splice bars, torque rail clips.
End stops & buffers: Install and torque per spec.
Conductor system: Mount conductor bars or festoon track parallel to the rail.
Record as-built readings. Correct now or pay later in wheel wear and motor overloads.
Lifting the Bridge
Rigging plan: Softeners protect painted flanges. Dedicated signaler on radio.
Sequence:
Install end trucks at staging height to simplify bridge pick.
For double-girder cranes, lift both girders with a matched raise.
Land the bridge on the end trucks and pin/bolt per GA.
Verify camber and bridge square.
Prior to trolley install, bump-test long-travel motors with temporary power (under permit): ensure correct rotation and brake release. Lock out after test.
Hoist & Trolley
Trolley installation: Mount wheels, align wheel flanges, set side-clearances.
Hoist reeving: Check rope path, sheave guards, and equalizer sheaves.
Limits & load devices: Check overload/SLI and emergency stop.
Cross-travel adjustment: Align trolley rails on a double-girder.
Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.
A smooth trolley with a quiet hoist is a sign of good alignment. Don’t mask issues with higher VFD ramps.
Electrics & Controls
Power supply: Drop leads tagged and strain-relieved.
Drive setup: Enable S-curve profiles for precise positioning.
Interlocks & safety: Zone limits near doors or mezzanines.
Cable management: Secure junction boxes; label everything for maintenance.
Future you will too. Photos of terminations help later troubleshooting.
ITP, Checklists, and Sign-Off
Inspection Test Plan (ITP): Hold/witness points for rail alignment, torque, electrical polarity, limit settings.
Torque logs: Record wrench serials and values.
Level & gauge reports: Attach survey prints.
Motor rotation & phasing: Confirm brake lift timing.
Functional tests: Anti-collisions and zone interlocks.
QA/QC is not paperwork—it’s your warranty in a binder.
Load Testing & Commissioning
Static load test: Hold at mid-span and near end stops; monitor deflection and brake performance.
Dynamic load test: Travel long-run, cross-travel, and hoist at rated speed with test load.
Operational checks: Emergency stop shuts down all motions.
Training & handover: Operator basics, daily pre-use checks, rigging do’s & don’ts.
Only after these pass do you hand over the keys.
Everyday Heavy Lifting
Construction & steel erection: placing beams, trusses, and precast.
Oil & gas & power: moving heavy pumps, skids, and pipe spools.
Steel mills & foundries: large part transfer.
Warehousing & logistics: bulk material moves with minimal floor traffic.
Floor stays clear, production keeps flowing, and precision goes up.
Do It Safe or Don’t Do It
Rigging discipline: rated slings & shackles, correct angles, spreader bars for load geometry.
Lockout/Tagout: clear isolation points for electrical work.
Fall protection & edges: approved anchor points, guardrails on platforms, toe boards.
Runway integrity: regular runway inspection plan.
Duty class selection: overspec when uncertainty exists.
A perfect lift is the one nobody notices because nothing went wrong.
Troubleshooting & Pro Tips
Crab angle/drift: verify end-truck wheel diameters and gearbox mounts.
Hot gearboxes: adjust brake air gap and reduce VFD decel.
Rope drum spooling: dress rope and reset lower limit.
Pendant lag or dropout: shield noisy VFD cables.
Wheel wear & rail pitting: lubrication and alignment issues.
Little noises are messages—listen early.
Quick Answers
Overhead vs. gantry? Choose per site constraints.
Single vs. double girder? Singles construction contract are lighter and cheaper; doubles carry heavier loads and give more hook height.
How long does install take? Anything from a couple weeks to a few months.
What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.
Who Gets the Most Value
Students and pros alike get a front-row seat to precision rigging, structural alignment, and commissioning. You’ll gain a checklist mindset that keeps cranes safe and productive.
Need a field bundle with JSA templates, rigging calculators, and commissioning sheets?
Download your pro bundle and cut hours from setup while boosting safety and QA/QC. Save it to your site tablet for quick reference.
...